Distribution Grid Connections

  • Request new or change electricity connection
  • Request for termination of electricity connection
  • Connection costs to the distribution grid

You can rely on DNB BA for the connection of a new electricity connection, relocation or termination of an existing connection.

Request new or change electricity connection

Do you need a new electricity connection or the modification of an existing connection? Then submit a request in advance via info@dnbba.be. Expect a lead time of at least 6 weeks for the realization of the new connection or the modification of an existing one.

State the following things with each new application:

  • The necessary power
  • The voltage level (medium or low voltage)
  • The (new) location of the electricity meter
  • Desired date 

All our connections are provided with a continuously read meter or AMR (automatic meter reading). Every 15 minutes, the meters read all the quantities that are necessary for the invoicing of energy consumption.

Request for termination of electricity connection

If you want to request a shutdown of an electricity connection, you must also communicate this via info@dnbba.be.

When terminating the connection, bear in mind the following:

  • Request the cancellation at least 30 days in advance
  • State the location of the electricity meter

Connection costs to the distribution grid

When you make a request for a connection or a termination of the connection to our distribution grid, you, as the applicant, are responsible for these costs.

View our connection conditions here:

  • Download the connection conditions for low voltage
  • Download the medium voltage connection conditions

Do you have any questions about your electricity connections? Do not hesitate to contact us.